{"id":9798,"date":"2022-10-27T11:47:29","date_gmt":"2022-10-27T09:47:29","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=9798"},"modified":"2022-11-28T11:49:14","modified_gmt":"2022-11-28T10:49:14","slug":"singapore-a-year-on-work-is-progressing-on-the-cr116-project","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/singapore-a-year-on-work-is-progressing-on-the-cr116-project\/","title":{"rendered":"Singapore: a year on, work is progressing on the CR116 project"},"content":{"rendered":"
October 27th, 2022<\/p>\n<\/div>
In July 2021, an internal consortium, comprising Soletanche Bachy International, Bachy Soletanche Singapore and Bessac, with our partner Gammon, was awarded the CR116 contract to construct the Ang-Mo-Kio metro station and other related structures. What stage are we at a year on? Discover the latest worksite progress, including a number of process optimisations and innovations.\u2026<\/strong><\/p>\n<\/div> A little over a year ago, the internal consortium celebrated winning the design-and-build contract to extend the Singapore metro\u2019s Ang Mo Kio station. This project forms part of the extension of the Cross Island Line, the eighth line on the metro network.<\/p>\n The project includes delivery of the station, located in the heart of the very dense Ang Mo Kio district,<\/strong> as well as its six entrances, its two underpasses created using the \u201cpipe jacking\u201d (microtunneling) technique, its cut-and-cover tunnel and its two tunnels created using a 7.2 diameter tunnel boring machine (TBM)<\/a>. The contract also includes upgrade and modification of the existing aboveground station, all by the end of 2029.<\/p>\n The internal consortium is positioned as a general contractor on this large-scale project.<\/strong><\/p>\n<\/div>