{"id":8305,"date":"2022-02-11T11:56:11","date_gmt":"2022-02-11T10:56:11","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=8305"},"modified":"2022-12-22T15:46:17","modified_gmt":"2022-12-22T14:46:17","slug":"sif-carries-out-special-works-to-modernise-lausanne-station","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/sif-carries-out-special-works-to-modernise-lausanne-station\/","title":{"rendered":"SIF carries out special works to modernise Lausanne Station"},"content":{"rendered":"
February 11th, 2022<\/p>\n<\/div>
Over the past few months, the Swiss railway operator CFF has entrusted work to modernise Lausanne station to the consortium formed by MARTI\/WALO\/PERRIN\/SOTRAG\/ADV\/JPF.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div> This consortium of companies from French-speaking Switzerland was supported by an association of companies comprising MARTI TS\/ISR Injectobohr\/WALO TS\/JPF TS & SIF to carry out the special works.<\/p>\n <\/p>\n \u00a0<\/p>\n \n<\/div> The works to be carried out are:<\/p>\n <\/h2><\/div> <\/p>\n This is a project posing numerous challenges for the worksite team: an urban worksite which is the second-largest station in the French-speaking part of Switzerland \u2013 a station which needs to remain in service throughout the works, meaning that a maximum level of safety will be required to guarantee our employees\u2019 safety as well as that of users. Finally, as a city-centre worksite, noise pollution will need to be minimised in order to limit the inconvenience caused to local residents by our work.<\/p>\n <\/p>\n The special works should take around three years.<\/p>\n \n<\/div>The works include:<\/h2><\/div>
\n
<\/span><\/div>
<\/span><\/div>\n
<\/span><\/div>