{"id":33595,"date":"2026-06-09T15:00:09","date_gmt":"2026-06-09T13:00:09","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/icold-2026-a-guadalajara-soletanche-bachy-et-cimesa-au-rendez-vous-mondial-des-barrages\/"},"modified":"2026-08-12T15:44:22","modified_gmt":"2026-08-12T13:44:22","slug":"icold-2026-in-guadalajara-soletanche-bachy-and-cimesa-at-the-worlds-premier-dam-congress","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/icold-2026-in-guadalajara-soletanche-bachy-and-cimesa-at-the-worlds-premier-dam-congress\/","title":{"rendered":"ICOLD 2026 in Guadalajara: Soletanche Bachy and Cimesa at the World’s Premier Dam Congress"},"content":{"rendered":"
09\/06\/2026<\/p>\n<\/div>
Nearly 1,000 participants from around the globe gathered at Expo Guadalajara for the 94th Annual Meeting of the International Commission on Large Dams (ICOLD). A landmark event for our industry, in which Soletanche Bachy and Cimesa played an active role.<\/p>\n<\/div>
This Mexican edition centred on the theme “Water, Energy and Society: The Evolving Role of Dams in a Changing World” \u2014 a topic more relevant than ever in the face of climate change and the energy transition. Over several days, engineers, experts and decision-makers from across the world exchanged views on water management, dam safety and new approaches in dam engineering.<\/p>\n<\/div>
Technical Highlights<\/strong><\/p>\n \u00a0<\/p><\/h2><\/div> Tailings Dams in the Spotlight \u2014 50 Years of Technical Committee L<\/strong><\/p>\n This edition marked the 50th anniversary of ICOLD’s Technical Committee L, dedicated to Tailings Dams and Waste Lagoons, whose first meeting was held in Mexico City in 1976. A symbolic milestone, celebrated on the very soil where it all began. The vitality of this committee reflects the growing importance of tailings management in our industry.<\/p>\n<\/div> Mexico’s Long Tradition of Large Dams<\/strong><\/p>\n \u00a0<\/p><\/h3><\/div> Mexico held its own on the technical front. At the congress, Guillermo Clavellina presented a paper on Santa Mar\u00eda Dam in the State of Sinaloa \u2014 a 125 m CFRD and the first in Mexico to feature an articulated plinth \u2014 “Construction of the positive cutoff wall of Santa Maria Dam in Sinaloa, Mexico”<\/em>. A notable technical contribution showcasing the expertise of our teams in the field.<\/p>\n The technical visit to La Yesca Dam also left a lasting impression: a 220 m CFRD at the heart of a 750 MW hydroelectric development operated by CFE.<\/p>\n<\/div>
<\/span><\/div><\/div><\/div>