{"id":30781,"date":"2025-05-15T14:57:45","date_gmt":"2025-05-15T12:57:45","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/soletanche-bachy-france-realise-les-travaux-de-modification-de-la-station-de-metro-kennedy-a-rennes\/"},"modified":"2025-05-15T15:19:24","modified_gmt":"2025-05-15T13:19:24","slug":"soletanche-bachy-france-carries-out-modification-work-at-kennedy-metro-station-in-rennes","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/soletanche-bachy-france-carries-out-modification-work-at-kennedy-metro-station-in-rennes\/","title":{"rendered":"Soletanche Bachy France carries out modification work at Kennedy metro station in Rennes"},"content":{"rendered":"

15\/05\/2025<\/p>\n<\/div>

<\/div>

Soletanche Bachy France carries out modification work at Kennedy metro station in Rennes<\/h1><\/div>
<\/div>

AXELERE is the name of the consortium formed by Demathieu Bard and Soletanche Bachy France, which has been awarded the contract to upgrade Kennedy station in order to increase the capacity of line A of Rennes\u2019 automatic metro system. <\/strong><\/p>\n<\/div>

<\/div>

With the steady growth in metro ridership, the city of Rennes has decided to increase the frequency of trains on line A at peak times, with the aim of carrying 9,300 people per hour per direction (compared with 7,500 today).<\/p>\n

In concrete terms, this involves creating a new platform and a rear station of approximately 200 metres.<\/p>\n<\/div>

<\/span><\/div>
<\/div><\/div><\/div>
<\/div>\n\n<\/div>
<\/div><\/div><\/div>\n<\/div><\/div>

Soletanche Bachy France<\/a>‘s programme includes the construction of almost 650 m of micro-Berlin wall, partly inside an existing car park and partly in the right-of-way of the traffic lanes closed for the occasion.<\/p>\n

The teams will be faced with a number of challenges, such as passing under a 13-storey residence, interfacing with (deactivated) anchors<\/a> in an adjacent park-and-ride facility, and underpinning<\/a> existing structures, all while creating as little nuisance as possible for local residents.<\/p>\n

The preparation period began on 6 January 2025 and will last 3 months. The micro-Berlin work will take place from April to December and will involve up to 4 drilling rigs simultaneously.<\/p>\n<\/div>

<\/div><\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>
<\/span><\/div>
<\/div><\/div><\/div>
<\/span><\/div>
<\/div><\/div><\/div><\/div><\/div>
<\/i>Find out more about our underpinning process<\/span><\/a><\/div>
<\/div>
<\/i>Find out more about our subsidiary Soletanche Bachy France<\/span><\/a><\/div>
<\/div><\/div><\/div>
<\/div><\/div><\/div><\/div>

Share the news<\/h3><\/div>

<\/a><\/a><\/a><\/a><\/a><\/a><\/div><\/div> <\/p>\n<\/div><\/div><\/div>
<\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>

Recent news<\/p>\n

<\/h2><\/div><\/div><\/div>

<\/i>All the news<\/span><\/a><\/div><\/div><\/div>
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France carries out modification work at Kennedy metro station in Rennes<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France a \u00e9t\u00e9 mandat\u00e9 pour construire un bassin de stockage \u00e0 Nantes<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Australia: Rob Carr carries out construction work on the Eleventh Road sewer collector in Armadale<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

ForSHORE: Bachy Balineau Antilles Guyane is involved in the renovation of the port of Jarry, in Guadeloupe!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rodio Swissboring carries out reinforcement work on the CA04S road in El Salvador<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Bachy Soletanche Singapore: Progress on the Construction of Riviera Station<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Bratislava Smart City Office: Soletanche Bachy Slovensko, HBM and Soletanche Ceska Republika Collaborate!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

New Zealand: March completes work on the Opal Drive Pump Station Project<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France: The Livernan Tunnel project is nearing completion after a year of work!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rodio Swissboring Reconstructs the Titihuapa Bridge in El Salvador<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Polska Returns for a Second Contract: The Tramway Tunnel Under Warsaw Station<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France contributes to the modernization and securing of the Nice-Breil railway line!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy strengthens its presence in the United States with the acquisition of Hub Foundation<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France builds the diaphragm walls of the future car park at Lausanne station<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Nicholson Construction: Focus on the Clean Lake project in GeoStrata<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rodio SwissBoring: Construction of its first LEED-certified building in Panama<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Polska advances on the Skyliner II<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

ForSHORE by CIMESA : Design – Construction of a quay in Veracruz<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Monaco Bel Air: Completion of Works by Soletanche SAM and Soletanche Bachy France Teams!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

GFWA improves the road network around Perth<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n<\/div>
<\/i><\/div>
<\/i><\/div><\/div><\/div><\/div>
<\/i>All the news<\/span><\/a><\/div><\/div><\/div><\/div><\/div>\n
<\/div>\n<\/div><\/div><\/div><\/div>\n
<\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"

Zetta-Lyze is a multi-application, multi-profile\/profession, multi-source database platform, easily accessible from anywhere, that provides production information in real time. <\/p>\n","protected":false},"author":1006,"featured_media":30767,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[461,464],"tags":[],"class_list":["post-30781","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-project"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/30781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/users\/1006"}],"replies":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/comments?post=30781"}],"version-history":[{"count":2,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/30781\/revisions"}],"predecessor-version":[{"id":30790,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/30781\/revisions\/30790"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media\/30767"}],"wp:attachment":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media?parent=30781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/categories?post=30781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/tags?post=30781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}