{"id":15562,"date":"2020-06-23T14:41:21","date_gmt":"2020-06-23T12:41:21","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/rodio-kronsa-realise-la-tour-ikon-a-valence-en-espagne\/"},"modified":"2023-11-13T17:42:44","modified_gmt":"2023-11-13T16:42:44","slug":"rodio-kronsa-builds-the-ikon-tower-in-valencia-in-spain","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/rodio-kronsa-builds-the-ikon-tower-in-valencia-in-spain\/","title":{"rendered":"Rodio Kronsa builds the Ikon tower in Valencia in Spain"},"content":{"rendered":"

23\/06\/2020<\/p>\n<\/div>

<\/div>

Rodio Kronsa builds the Ikon tower in Valencia in Spain<\/h1><\/div>
<\/div>

From the end of April, Rodio Kronsa has been carrying out earthmoving and foundation works for Kronos Homes, for the construction of a new residential tower.<\/strong><\/p>\n<\/div>

<\/div>

Designed by architect Ricardo Bofill, this 29-storey tower in Valencia will be the tallest residential building in the city. In addition to the earthmoving, Rodio Kronsa<\/a> is responsible for the foundation works for the building using Rodiostar\u00ae piles, anchors<\/a>, prefabricated and civil engineering<\/a> works.<\/p>\n

The site teams face a number of challenges during this project: a very tight timeframe, the presence of many specialisms all at the same time, as well as working in close proximity to service networks.<\/p>\n

The works are currently in the execution phase of the Rodiostar\u00ae pile wall (an equivalent of Starsol\u00ae piles).<\/p>\n

The works are expected to be finished by the end of December 2020.<\/p>\n<\/div>

<\/span><\/div>
<\/div><\/div><\/div>
<\/div>\n\n<\/div>
<\/div><\/div><\/div>\n<\/div><\/div>

Share the news<\/h3><\/div>

<\/a><\/a><\/a><\/a><\/a><\/a><\/div><\/div> <\/p>\n<\/div><\/div><\/div>
<\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>

Recent news<\/p>\n

<\/h2><\/div><\/div><\/div>

<\/i>All the news<\/span><\/a><\/div><\/div><\/div>
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France brings the ForSHORE brand to life with the modernization of the Richelieu Quay in S\u00e8te!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy Paraguay successfully delivers the Paseo 55 project in Asunci\u00f3n<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy Canada contributes to a new subway project in Toronto<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

In Le Havre, Soletanche Bachy Fondations Sp\u00e9ciales to Build Foundations for a Wind Turbine Factory<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Bessac: The Tunnel Boring Machine Reaches a Major Milestone on Toulouse Metro Line C!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

ForSHORE: Cimesa contributes to the expansion of the dock at the ATP terminal located in the Port of Altamira in Mexico<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France carries out modification work at Kennedy metro station in Rennes<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

First use of the Screwsol\u00ae technique for McDonnell Piling !<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rodio Swissboring Successfully Completes the Construction of CAF’s Regional Office in Panama<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France a \u00e9t\u00e9 mandat\u00e9 pour construire un bassin de stockage \u00e0 Nantes<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Australia: Rob Carr carries out construction work on the Eleventh Road sewer collector in Armadale<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

ForSHORE: Bachy Balineau Antilles Guyane is involved in the renovation of the port of Jarry, in Guadeloupe!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rodio Swissboring carries out reinforcement work on the CA04S road in El Salvador<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Bachy Soletanche Singapore: Progress on the Construction of Riviera Station<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Bratislava Smart City Office: Soletanche Bachy Slovensko, HBM and Soletanche Ceska Republika Collaborate!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

New Zealand: March completes work on the Opal Drive Pump Station Project<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France: The Livernan Tunnel project is nearing completion after a year of work!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rodio Swissboring Reconstructs the Titihuapa Bridge in El Salvador<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Polska Returns for a Second Contract: The Tramway Tunnel Under Warsaw Station<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France contributes to the modernization and securing of the Nice-Breil railway line!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n<\/div>
<\/i><\/div>
<\/i><\/div><\/div><\/div><\/div>
<\/i>All the news<\/span><\/a><\/div><\/div><\/div><\/div><\/div>\n
<\/div>\n<\/div><\/div><\/div><\/div>\n
<\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"

Zetta-Lyze is a multi-application, multi-profile\/profession, multi-source database platform, easily accessible from anywhere, that provides production information in real time. <\/p>\n","protected":false},"author":1006,"featured_media":15553,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[461,464],"tags":[],"class_list":["post-15562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-project"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/15562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/users\/1006"}],"replies":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/comments?post=15562"}],"version-history":[{"count":0,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/15562\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media\/15553"}],"wp:attachment":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media?parent=15562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/categories?post=15562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/tags?post=15562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}