{"id":12997,"date":"2021-03-26T12:16:52","date_gmt":"2021-03-26T11:16:52","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=12997"},"modified":"2023-01-17T12:32:14","modified_gmt":"2023-01-17T11:32:14","slug":"soletanche-bachy-brings-its-technical-expertise-to-rail-and-metro-transport","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/soletanche-bachy-brings-its-technical-expertise-to-rail-and-metro-transport\/","title":{"rendered":"Soletanche Bachy brings its technical expertise to rail and metro transport"},"content":{"rendered":"

March 26th, 2021<\/p>\n<\/div>

<\/div>

Soletanche Bachy brings its technical expertise to rail and metro transport<\/h1><\/div>
<\/div>

Every day, millions of us take public transport to commute to work, see our loved ones and travel around… But do you know how our subways and train networks are built? From diaphragm walls to compensation grouting, from forepoling to tunnel boring, Soletanche Bachy\u2019s teams work tirelessly to create these complex and ambitious structures. This month we invite you to explore behind the scenes of these sites!<\/strong><\/p>\n<\/div>

<\/div>

Techniques for large-scale projects<\/h2><\/div>

At Soletanche\u00a0<\/span><\/span>Bachy<\/span><\/span>, we create structures all around the world that ad<\/span><\/span>d<\/span><\/span>ress regions<\/span><\/span>\u2019 various mobility challenges \u2013 f<\/span><\/span>rom subways to train stations, underground stations, tunnels, railway lines and tramways\u2026<\/span><\/span>\u00a0<\/span><\/h4>\n

 <\/p>\n

These projects are impressive in terms of their scale as well as the range of foundation techniques they require.<\/span><\/span>\u00a0<\/span><\/p>\n

As in the U<\/span><\/span>nited\u00a0<\/span><\/span>K<\/span><\/span>ingdom<\/span><\/span>, for example, where our colleagues at\u00a0<\/span><\/span>Bachy<\/span><\/span><\/a>\u00a0Soletanche Limited\u00a0<\/span><\/span>are currently working on the construction of a new high-speed rail link connecting London, the Midlands, the North and Scotland. The project will serve more than 25 stations and connect around 30 million people.\u00a0<\/span><\/span>\u00a0<\/span><\/p>\n

In France, the Grand Paris Express also highlights the multi-disciplinary approach required by transport infrastructure projects.<\/span><\/span>\u00a0<\/span><\/p>\n

For work package T2a on southbound line 15, for example, we are involved as part of the\u00a0<\/span><\/span>Horizon\u00a0<\/span><\/span>consortium in retaining<\/a>, freezing<\/a>, injection and tunnelling<\/a> work (with<\/span><\/span>\u00a0<\/span><\/span>Bessac<\/span><\/span>\u00a0<\/span><\/span><\/a>and\u00a0<\/span><\/span>Soletanche\u00a0<\/span><\/span>Bachy<\/span><\/span>\u00a0Tunnels<\/span><\/span><\/a>) and deep foundations (with\u00a0<\/span><\/span>Soletanche\u00a0<\/span><\/span>Bachy<\/span><\/span>\u00a0<\/span><\/span>Fondations<\/span><\/span>\u00a0<\/span><\/span>Sp\u00e9ciales<\/span><\/span><\/a>).\u00a0<\/span><\/span><\/p>\n<\/div>

<\/span><\/div>
\n

Line 15 Lot T2A of Grand Paris Express<\/p>\n<\/div>\n<\/div>

To complete this project, we drew on extensive expertise in special foundation techniques and knowledge of soils. In fact, these extraordinary structures presented ambitious challenges, such as the construction of diaphragm walls<\/a> 1.50m thick and up to 70m deep\u2026 Challenges that were successfully overcome thanks to our teams' expertise!<\/span><\/span>\u00a0<\/span><\/p>\n<\/div>

Transport: worksites that are often in cities\u2026 and cramped!<\/h2><\/div>

What makes public transport sites particularly challenging is their location in urban environments, creating constraints associated directly with the working environment<\/span><\/span>:<\/span><\/span>\u00a0<\/span><\/span>T<\/span><\/span>he city with its buildings, the city with its inhabitants<\/span><\/span>.<\/span><\/span>\u00a0<\/span><\/h4>\n

Space is limited, other transport lines and public places continue to operate and, finally, the worksites are surrounded by numerous<\/span>\u00a0<\/span>nearby buildings<\/span>, who our works<\/span>\u00a0must not impact<\/span>.<\/span>\u00a0<\/span><\/p>\n

In Nice, France, during construction of tramway line 2 connecting the airport to Port\u00a0<\/span><\/span>Lympia<\/span><\/span>, for the und<\/span><\/span>erground section, our teams from<\/span><\/span>\u00a0<\/span><\/span>Soletanche<\/span>\u00a0<\/span><\/span>Bachy<\/span><\/span>\u00a0<\/span><\/span>France<\/span><\/span>,\u00a0<\/span><\/span>Bessac<\/span><\/span><\/a>\u00a0and\u00a0Soletanche\u00a0<\/span><\/span>Bachy<\/span><\/span>\u00a0Tunnels<\/span><\/span><\/a><\/span><\/span>\u00a0created a 3.2km tunnel, four underground stations and two shafts. This part of the worksite, particularly Garibaldi station,\u00a0<\/span><\/span>was located in<\/span><\/span>\u00a0the heart of the 19th century city centre, with a rich architectural and historical heritage. Our teams therefore had to work in a very restricted space while actively monitoring the ancient foundations of nearby buildings.<\/span><\/span>\u00a0<\/span><\/p>\n<\/div>

<\/span><\/div>
\n

Nice Tramway in France<\/p>\n<\/div>\n<\/div>

In New Zealand, on the CRL<\/span><\/span>\u00a0<\/span><\/span><\/span>C5 worksite,<\/span><\/span><\/h4>\n

Our\u00a0<\/span>S<\/span><\/span>oletanche<\/span>\u00a0<\/span><\/span>Bachy<\/span><\/span>\u00a0International<\/span><\/span>\u00a0and\u00a0March<\/a><\/span><\/span>\u00a0Construction<\/span><\/span>\u00a0teams are once again demonstrating our ability to carry out work on particularly complex rail infrastructure.<\/span><\/span><\/p>\n

Complex\u00a0<\/span>since operations (passenger traffic) will continue throughout the works<\/span><\/b>, even when we come to lower the overall level of the tracks and then install the branch lines connecting to the new tracks.<\/span><\/p>\n<\/div>

<\/span><\/div>
\n

CRL C5 worksite in Auckland NZ, skyview<\/p>\n<\/div>\n<\/div>

To enable construction of 3km of retaining walls, two road bridges, two footbridges and two railway interchanges by the end of 2022, specific phasing needed to be developed, built around both rail safety and the safety of our teams.\u00a0<\/span>\u00a0<\/span><\/p>\n

In total, the project includes around\u00a0<\/span>1,200 piles, 7500m<\/span><\/b>2<\/span><\/b>\u00a0of diaphragm walls<\/span><\/b>, 100,000m<\/span>3<\/span>\u00a0of rubble and 20,000m<\/span>3<\/span>\u00a0of structural concrete.<\/span>\u00a0<\/span><\/p>\n

Of course<\/span><\/span>\u00a0this list is not exhaustive! Discover<\/span><\/span>\u00a0more projects\u00a0about rail, metro and its stations, as well as\u00a0the solutions\u00a0we offer to achieve them.<\/span><\/span><\/h4>\n<\/div>
<\/div><\/div><\/div>
<\/div>\n\n<\/div>
<\/div><\/div><\/div>\n<\/div><\/div>

Share the news<\/h3><\/div>

<\/a><\/a><\/a><\/a><\/a><\/a><\/div><\/div> <\/p>\n<\/div><\/div><\/div>
<\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>

Recent news<\/p>\n

<\/h2><\/div><\/div><\/div>

<\/i>All the news<\/span><\/a><\/div><\/div><\/div>
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

[Ingenious Podcast] \u201cInside the Grand Palais: Mission Stability\u201d<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Roger Bullivant: First Use of a 100% Electric Piling Rig in the UK!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Brady teams build a barge ramp in Cairns, Australia!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Mega Fraternidad \u2013 Corredor Verde: Rodio Swissboring completes slope stabilization works<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

A 100% Electric Construction Site: Soletanche Bachy France Works on the Redevelopment of a Building in Paris<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

ForSHORE by Rodio Kronsa: Construction of the foundations for a cruise terminal in the Canary Islands<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Czech Republic: A New Heart Beats in Brno Thanks to Soletanche Polska!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rogue\u2019s Wind: Nicholson successfully completes micropile foundations for 8 wind turbines<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Foundation Alliance delivers foundations for Zion Road project<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

[Ingenious Podcast] \u2018Petronas Towers: the construction site that broke all records\u2019 narrated by Christophe Dauchy<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

[VIDEO] Episode 2 : \u00ab Women in Civil Engineering? So what! \u00bb<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

The Underground Adventure at Soletanche Bachy: start the game!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

BESSAC celebrates its 50th anniversary!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Polska: Foundation Works for Phase IV of the Krak\u00f3w Tram Completed!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

London Gatwick: Bachy Soletanche completes foundations for Pier 6 extension<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

[New Ingenious Podcast] Listen to the first episode, \u201cSeptember 11: The Ground Zero Challenge\u201d<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France and Balineau contribute to the restoration and reinforcement of the Pont de Pierre in Bordeaux<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Polska Builds the Foundations of a Retention Basin in \u0141acina Using Trenchmix\u00ae<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

VIDEO: \u201cWomen in civil engineering ? So what!\u201d \u2013 Discover Episode 1<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy Fondations Sp\u00e9ciales is building the foundations for Digital Realty MRS5 in Marseille!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n<\/div>
<\/i><\/div>
<\/i><\/div><\/div><\/div><\/div>
<\/i>All the news<\/span><\/a><\/div><\/div><\/div><\/div><\/div>\n
<\/div>\n<\/div><\/div><\/div><\/div>\n
<\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"

Zetta-Lyze is a multi-application, multi-profile\/profession, multi-source database platform, easily accessible from anywhere, that provides production information in real time. <\/p>\n","protected":false},"author":1006,"featured_media":12954,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[461,464],"tags":[],"class_list":["post-12997","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-project"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/12997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/users\/1006"}],"replies":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/comments?post=12997"}],"version-history":[{"count":0,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/12997\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media\/12954"}],"wp:attachment":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media?parent=12997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/categories?post=12997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/tags?post=12997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}