{"id":11520,"date":"2022-04-15T17:01:55","date_gmt":"2022-04-15T15:01:55","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/quand-soletanche-bachy-fondations-speciales-intervient-pour-la-preservation-de-la-biodiversite-de-la-bievre\/"},"modified":"2022-12-20T18:45:01","modified_gmt":"2022-12-20T17:45:01","slug":"soletanche-bachy-fondations-speciales-steps-in-to-preserve-biodiversity","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/soletanche-bachy-fondations-speciales-steps-in-to-preserve-biodiversity\/","title":{"rendered":"Soletanche Bachy Fondations Sp\u00e9ciales steps in to preserve biodiversity"},"content":{"rendered":"

April 15th, 2022<\/p>\n<\/div>

<\/div>

Soletanche Bachy Fondations Sp\u00e9ciales steps in to preserve biodiversity<\/h1><\/div>
<\/div>

Following more than two years of work, the Bi\u00e8vre is flowing in the open once more.<\/strong><\/p>\n<\/div>

Having been covered over along part of its course at the start of the 20th century, the Bi\u00e8vre has been the subject of a major development project undertaken in the Val-de-Marne over the past decade. The objective was not only to make it visible again, but to restore nature by recreating a real river. After the reopening of a section in L\u2019Ha\u00ff-les-Roses in 2016, the Bi\u00e8vre renaissance project continued with the opening of a further section in Arcueil and Gentilly.<\/p>\n<\/div>

<\/div><\/div><\/div>
<\/div>\n\n<\/div>
<\/div><\/div><\/div>\n<\/div><\/div>
<\/span><\/div>
<\/div><\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>

This large-scale operation was part of a financial partnership between the Val-de-Marne department (as project owner), the Grand Paris intermunicipal authority, the Seine-Normandy water agency and the \u00cele-de-France region.<\/p>\n

The project involved reopening a 610m section between Rue Gandilhon in Gentilly and Avenue Paul Doumer in Arcueil.<\/p>\n<\/div>

<\/div><\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>
<\/span><\/div>
<\/div><\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>

Soletanche Bachy Fondations Sp\u00e9ciales<\/a> participated in this project as part of a consortium with Valentin TP & France Travaux. The works undertaken by SBFS involved building definitive lutetian-type walls along a length of approximately 340m, walls allowing a widening of the bed of the watercourse, hitherto channelled within a masonry gutter below the level of the existing ground, while preserving the rights of way for public roads and pedestrians, as well as common property facilities such as sports fields or footbridges in the Coteau de Bi\u00e8vre park.<\/p>\n

After preparations were slowed by the Covid-19 pandemic and numerous adjustments made to the project geometry (related to site constraints), initial work on the lutetian-type walls began in August 2020 and was completed in October 2021. The Valentin TP and France Travaux teams then took over to complete the project a few weeks ago.<\/p>\n<\/div>

<\/div><\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>
<\/i>Find out more about our retaining structures solutions<\/span><\/a><\/div>
<\/div>
<\/i>Find out more about Soletanche Bachy Fondations Sp\u00e9ciales<\/span><\/a><\/div><\/div><\/div>
<\/div><\/div><\/div><\/div>

Share the news<\/h3><\/div>

<\/a><\/a><\/a><\/a><\/a><\/a><\/div><\/div> <\/p>\n<\/div><\/div><\/div>
<\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>

Recent news<\/p>\n

<\/h2><\/div><\/div><\/div>

<\/i>All the news<\/span><\/a><\/div><\/div><\/div>
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Arkabutla Lake Dam: Nicholson Construction Completes Critical Stabilization Work<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Nicholson: modernization of a pumping station in Louisville<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy in Vienna for the ICSMGE 2026 conference<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

FIFA World Cup 2026: CIMESA contributed to the construction of the Azteca Stadium in Mexico<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

[Ingenious Podcast] In Marianne’s Shoes: From project studies to construction site supervision<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Birtinya Pedestrian Bridge: Brady Marine & Civil delivers a cable stayed landmark on the Sunshine Coast<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

[VIDEO] Episode 3 : \u00ab Women in Civil Engineering? So what! \u00bb<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

[Ingenious Podcast] \u201cInside the Grand Palais: Mission Stability\u201d<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Roger Bullivant: First Use of a 100% Electric Piling Rig in the UK!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Brady teams build a barge ramp in Cairns, Australia!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Mega Fraternidad \u2013 Corredor Verde: Rodio Swissboring completes slope stabilization works<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

A 100% Electric Construction Site: Soletanche Bachy France Works on the Redevelopment of a Building in Paris<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

ForSHORE by Rodio Kronsa: Construction of the foundations for a cruise terminal in the Canary Islands<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Czech Republic: A New Heart Beats in Brno Thanks to Soletanche Polska!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rogue\u2019s Wind: Nicholson successfully completes micropile foundations for 8 wind turbines<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Foundation Alliance delivers foundations for Zion Road project<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

[Ingenious Podcast] \u2018Petronas Towers: the construction site that broke all records\u2019 narrated by Christophe Dauchy<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

[VIDEO] Episode 2 : \u00ab Women in Civil Engineering? So what! \u00bb<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

The Underground Adventure at Soletanche Bachy: start the game!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

BESSAC celebrates its 50th anniversary!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n<\/div>
<\/i><\/div>
<\/i><\/div><\/div><\/div><\/div>
<\/i>All the news<\/span><\/a><\/div><\/div><\/div><\/div><\/div>\n
<\/div>\n<\/div><\/div><\/div><\/div>\n
<\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"

Zetta-Lyze is a multi-application, multi-profile\/profession, multi-source database platform, easily accessible from anywhere, that provides production information in real time. <\/p>\n","protected":false},"author":3,"featured_media":11504,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_ayudawp_aiss_exclude":false,"_ayudawp_aiss_exclude_summary":false,"_ayudawp_aiss_summary":"","_ayudawp_aiss_summary_provider":"","_ayudawp_aiss_summary_hash":"","footnotes":""},"categories":[550,461],"tags":[],"class_list":["post-11520","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-environment","category-news"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t\n\t\n\t\n\t\n\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t