{"id":19753,"date":"2023-08-08T15:09:09","date_gmt":"2023-08-08T13:09:09","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?post_type=avada_portfolio&p=19753"},"modified":"2023-08-11T17:59:20","modified_gmt":"2023-08-11T15:59:20","slug":"express-rail-link-xrl-hong-kong","status":"publish","type":"avada_portfolio","link":"https:\/\/www.soletanche-bachy.com\/en\/offer-portfolio\/express-rail-link-xrl-hong-kong\/","title":{"rendered":"Express Rail Link (XRL), Hong Kong"},"content":{"rendered":"
This high-speed train line connects Hong Kong with Guangzhou in 48 minutes.<\/p>\n<\/div>
Bachy Soletanche Group Limited<\/a> was part of the integrated consortium which was awarded Contract 811 A (Express Rail Link). The scope of works comprises the construction of a 300 metre long cut-and-cover tunnel in a dense urban environment.<\/p>\n<\/div> During the first phase, advanced utility and traffic diversion works were completed. In particular, a viaduct was completely dismantled and rebuilt at a different location. In the second phase, the geotechnical works which comprised an excavation of a 240,000 cu. metre “box” of 30 deep metre, was carried out. The third and last phase consisted in building the permanent reinforced concrete underground structure inside the diaphragm wall<\/a> and a building to accommodate the mechanical and electrical rooms. The main technical difficulty of the project lies with the crossing of the existing metro line. This imposes a very specific sequence of works and limits the allowable settlement and displacements.<\/p>\n The existing line being founded on barrettes socketed into the rock, BSGL has proposed to re-use them to support the newly built structure. The final task, the load transfer from the old to the new structure, was a very delicate operation.<\/p>\n<\/div>Our solution<\/h2><\/div>